Other
|
Federal Express 50 Van Sort Belt Facility
As structural engineering consultant for the architect, Beicker
Engineering, Inc. provided a full scope of structural engineering
services as outlined in the AIA Document C141. Design consisted of load
bearing tilt-up concrete exterior walls, spread concrete footing
foundation. Construction cost for this project was $1.1 M. and was
completed in 1990.
|
San Antonio River Authority
Office Addition and Remodel As the structural engineering
consultant for the architect, Beicker Engineering, Inc. provided a full
scope of structural engineering services as outlined in the AIA
Document C141. Design consisted of a four story new office building
using deep, drilled concrete piers, cast-in-place post-tension
reinforced flat plate floor slabs, Cast-in-place concrete columns and
retaining earth basement walls and structural steel truss roof framing
with sloped standing seam metal roofing. Design also consisted of
remodeling the existing precast concrete wall office structure that
relocated load-bearing concrete walls and replaced the roof framing.
Construction cost for this project was $2.4 M. and Phase I was
completed in 1988.
|
QVC San Antonio
As the structural engineering consultant on the design-build team
with Metropolitan Contracting and Lyda, Inc, Beicker Engineering, Inc.
provided a full scope of structural engineering services as outlined in
the AIA Document C141 for this new two-story center in Westover Hills.
The design of the structure consisted of using deep drilled concrete
foundation piers, a grade supported floating concrete floor slab,
site-cast concrete load-bearing tilt-up wall panels and conventional
bar joist and beam superstructure roof framing. Construction cost for
this project was $3.0 M and was completed in 1991.
| |